Renovation Updates

Here are the updates for week three of the renovation project. For renderings of what the finished product will look like, see our post, Building New Spaces For Worship & Connection.

Electrician chiseling concrete

One of the electricians chiseling out a stage wiring box.

Framing in the new café

Not too much to see in the café so far. Besides the wall to the foyer being removed, some new framing has gone up inside the Café.

New framing in the Living Room

The Living Room space’s feature wall is being framed-out.

Framing new walls in the Worship Center

Framing up the new walls on the stage in the Worship Center.

Handing a steel stud up to a worker on a lift

Lifting a stud into place.

Framing new wall in the Worship Center

A wide-angle view looking up from the floor of the stage to a worker installing steel studs.

Sparks flying while cutting a steel stud

Sparks flying while a worker cuts a steel stud to length.

Looking straight up to the ceiling with all the tiles removed

The view looking straight up to the ceiling with all the tiles removed.

Wide view of the Worship Center from the back of the room

Progress so far from the back of the room.

Electricians pulling electrical through a new wall

The electricians pulling electrical through a new wall on the stage.